December was a rough month all around. We were already behind schedule due to weather setbacks...Continue reading
45 – Simple living, the final step.
January was fast approaching. Our youngest daughter was set to transfer to NAU/Flagstaff and the sale...Continue reading
44 – Off grid solar system
Next up was a solar system large enough to run everything except the air conditioner. No...Continue reading
43 – Skirting the 5th wheel
Even though our 5th wheel has a well insulated belly pan you can still lose a...Continue reading
42 – Still Lots To Do, Getting Ready for Full Time RV Living
Since we are built on the side of a hill we have to deal with water...Continue reading
41 – Bringing Our New Home, Home.
Before we could move the 5th wheel to it’s temporary home we had to run water...Continue reading
40 – Rolling With Changes
We are so used to this adventure twisting and turning, we’d probably have heart attacks if...Continue reading
39 – Septic Install
The design called for so much leach rock below the 4″ perforated pipe and so much...Continue reading
38 – Septic Dig
The huge leach field required really was bad news. The digging in this area is terrible...Continue reading
37 – Septic Design
Now that we had water plumbed to the home site we needed a place for wastewater...Continue reading